Aerial view of Bangor railway station, 2006
Disgrifiadau
Aerial view showing the railway station and surrounding buildings at Bangor in 2006. Click on image to enlarge.
Bangor railway station opened in 1848. It is on the North Wales line between Euston and Holyhead. The station became an important junction after branch lines were opened to Caernarfon, Amlwch and Bethesda. Now reduced to two platforms after the closure of these branch lines in the 1960's.
More items with these tags
Cysylltwch â Ni
I wneud cais i dynnu i lawr neu riportio cynnwys hiliol, sarhaus neu niweidiol mewn unrhyw ffordd arall.
You must be logged in to leave a comment